You are here:Home1/Case Studies2/Installing 500 New Light Poles with Hydrovac Technology
INSTALLING 500 NEW LIGHT POLES WITH HYDROVAC TECHNOLOGY
CASE STUDY
Seaside Heights needed to install hundreds of new light poles, however, limitations with town ordinances prevented the use of heavy equipment. We turned to hydro-vac excavation and Adler’s specialized equipment to successfully execute the job.
A LIGHTER SOLUTION
Hydrovac Helps Seaside Heights Install 500 New Light Poles
Seaside Heights needed to install hundreds of new light poles, but town ordinances and crowded conditions prevented the use of heavy equipment. Electric company PSEG and construction company J.W. Didado selected Adler Companies for their expertise and innovative approach.
Installing Light Poles Without Heavy Equipment
Using hydrovac trucks, Adler Companies precisely excavated eight-foot holes with a twenty-four-inch diameter. Their lightweight, nimble, and safe technology allowed them to maneuver hoses over fences and obstacles, quickly and efficiently digging with 1,200 gallons of water at 2,500 PSI. The remote control technology ensured safer and more efficient operations.
Built to Sustain Tough Weather
Despite winter restrictions due to tourism, Adler Companies completed over 500 light pole excavations in two years. Their hydrovac equipment could even use hotter water to pierce through icy ground, maintaining productivity in tough weather conditions. Adler also assisted in placing the poles using cranes, ensuring the project’s successful completion.